Mk3 — shaft runout, not the bearing

Why this is a project and not a paragraph. It has its own owner, its own evidence, its own open questions with a P0 on them, and two other projects are downstream of it — [[cascadia-contract]] is blocked on it through hobbs-po6, and [[do-160-certification]]‘s eight-month number was costed against the failure this project says is the wrong one.

State

Dmitri is confident it is not the bearing. Rowan, Monday 14 September, from the 07:00 conversation in the test cell:

“He’s been running shaft runout tests on his own time for a fortnight and he’s now confident it isn’t the bearing — he wants to bring it to Priya formally this week.”

A fortnight of testing on his own time, which began before the 7 September conversation in which the theory first reached Rowan.

Before that, 7 September, in Rowan’s words:

“Dmitri’s thing on the bearing. He doesn’t think it’s the bearing. He thinks it’s shaft runout and the bearing is just where it shows up, which — if he’s right that’s a different failure and it changes the whole DO-160 schedule, and I need to not say that out loud to anyone until he’s sure.”

What is known, and what is not

KnownHe is confident it is not the bearing, after a fortnight of his own tests
Not recordedWhat would formally confirm runout
Not recordedHow many days that takes
Not recordedWhether anything he has already run counts as confirmation

Those three are hobbs-62a, P0, and they are the reason the chain beneath this project has not moved. “This week” was Dmitri’s own commitment, made in a week that ended Sunday 20 September.

The constraint

HAL-01 — nothing about this reaches Marcus until Rowan lifts it. Whether it covers Priya is unanswered: hobbs-9xk. Full record in Atlas/ventures/halcyon/decisions.md.

Tasks

hobbs-62aP0What confirms or rules out runout, and in how many days
hobbs-9xkP1Does the hold cover Priya, before Dmitri takes it to her
hobbs-po6P1Blocked on hobbs-62a. Does the answer move the Cascadia witness point
hobbs-9fbP2Rig state into a file Priya can read without Dmitri

The single point of failure, unaddressed

Mk3 rig state lives in a spreadsheet Dmitri maintains and in Dmitri’s head — mostly the head. Recorded on day one, unchanged since. hobbs-9fb.

People

[[Dmitri Sokolov]] · [[Priya Raghunathan]]

Markdown source
---
type: project
venture: halcyon
status: active
outcome:
owner: Dmitri Sokolov
due:
updated: 2026-09-23
---

# Mk3 — shaft runout, not the bearing

<!-- src: Atlas/ventures/halcyon/VENTURE.md, split out 2026-09-23 under ADR-31 -->

**Why this is a project and not a paragraph.** It has its own owner, its own
evidence, its own open questions with a P0 on them, and **two other projects are
downstream of it** — [[cascadia-contract]] is blocked on it through `hobbs-po6`,
and [[do-160-certification]]'s eight-month number was costed against the failure
this project says is the wrong one.

## State

**Dmitri is confident it is not the bearing.** Rowan, Monday 14 September, from
the 07:00 conversation in the test cell:

> "He's been running shaft runout tests on his own time for a fortnight and he's
> now confident it isn't the bearing — he wants to bring it to Priya formally
> this week."

**A fortnight of testing on his own time**, which began before the 7 September
conversation in which the theory first reached Rowan.

Before that, 7 September, in Rowan's words:

> "Dmitri's thing on the bearing. He doesn't think it's the bearing. He thinks
> it's shaft runout and the bearing is just where it shows up, which — if he's
> right that's a different failure and it changes the whole DO-160 schedule, and
> I need to not say that out loud to anyone until he's sure."

## What is known, and what is not

| | |
|---|---|
| **Known** | He is confident it is not the bearing, after a fortnight of his own tests |
| **Not recorded** | What would **formally confirm** runout |
| **Not recorded** | **How many days** that takes |
| **Not recorded** | Whether anything he has already run counts as confirmation |

**Those three are `hobbs-62a`, P0**, and they are the reason the chain beneath
this project has not moved. **"This week" was Dmitri's own commitment, made in a
week that ended Sunday 20 September.**

## The constraint

**`HAL-01`** — nothing about this reaches Marcus until Rowan lifts it. Whether it
covers Priya is unanswered: `hobbs-9xk`. Full record in
`Atlas/ventures/halcyon/decisions.md`.

## Tasks

| | | |
|---|---|---|
| `hobbs-62a` | **P0** | What confirms or rules out runout, and in how many days |
| `hobbs-9xk` | P1 | Does the hold cover Priya, before Dmitri takes it to her |
| `hobbs-po6` | P1 | Blocked on `hobbs-62a`. Does the answer move the Cascadia witness point |
| `hobbs-9fb` | P2 | Rig state into a file Priya can read without Dmitri |

## The single point of failure, unaddressed

**Mk3 rig state lives in a spreadsheet Dmitri maintains and in Dmitri's head —
mostly the head.** Recorded on day one, unchanged since. `hobbs-9fb`.

## People