Atlas/ventures/ophelia/projects/race-season.md
The season — first race 3 October
First race of the season: Saturday 3 October 2026. Ten days from 2026-09-23.
The one thing this project needs and does not have
The entry deadline is unknown. hobbs-935, P2.
It has been unknown since 5 September and it is the only date in this venture that has never been established. A 19 September splash left fourteen days to the race; Rowan is back from [[tomales-passage]] on the 27th, six days before it, and if the deadline falls inside the weekend he is on a boat with no reason to be thinking about it.
Not assumed, not estimated, and not inferred from any other race (rule 17).
Why this is a project and not a task
hobbs-935 is one call. The season is not. This note exists so that when the
deadline is answered there is somewhere for the rest of it to land — the schedule,
the crew, and whether she is raced at all this year — rather than a closed task
and nothing behind it.
Nothing about the season beyond 3 October is in this vault. Stated so that the blank is visible rather than read as an empty calendar.
The thing that gates all of it
Rowan cannot wind a winch with his right arm, so he cannot single-hand her,
and he has stopped offering. That is a fact from health and it is recorded
here because it bears on this project directly. The conclusion he drew about it
does not appear here, in the brief, or anywhere else — his instruction, and it
holds (ADR-11, health).
Markdown source
---
type: project
venture: ophelia
status: active
outcome:
owner: Rowan
due:
updated: 2026-09-23
---
# The season — first race 3 October
<!-- src: Atlas/ventures/ophelia/VENTURE.md, split out 2026-09-23 under ADR-31 -->
**First race of the season: Saturday 3 October 2026.** Ten days from 2026-09-23.
## The one thing this project needs and does not have
**The entry deadline is unknown.** `hobbs-935`, P2.
**It has been unknown since 5 September and it is the only date in this venture
that has never been established.** A 19 September splash left fourteen days to the
race; Rowan is back from [[tomales-passage]] on the 27th, **six days before it**,
and if the deadline falls inside the weekend he is on a boat with no reason to be
thinking about it.
**Not assumed, not estimated, and not inferred from any other race** (rule 17).
## Why this is a project and not a task
`hobbs-935` is one call. **The season is not.** This note exists so that when the
deadline is answered there is somewhere for the rest of it to land — the schedule,
the crew, and whether she is raced at all this year — rather than a closed task
and nothing behind it.
**Nothing about the season beyond 3 October is in this vault.** Stated so that the
blank is visible rather than read as an empty calendar.
## The thing that gates all of it
Rowan **cannot wind a winch with his right arm**, so he cannot single-hand her,
and **he has stopped offering.** That is a fact from `health` and it is recorded
here because it bears on this project directly. **The conclusion he drew about it
does not appear here, in the brief, or anywhere else** — his instruction, and it
holds (ADR-11, `health`).