The $84,000 change order

[[Dario Pineda]] is 20% over with no signed change order. The change order is $84,000 and it is unsigned on Rowan’s desk.

The age, derived and not decremented

“Five weeks” as of 5 September, which is Rowan’s own count and the only count anyone has stated. Re-derived against 2026-09-23 from that figure and that date: roughly seven and a half weeks. The figure is derived from his statement, not from a fresh one — nobody has asked Dario or Rowan for a current count (SL-01: a count is transcribed from a source, never carried forward from the last time it was written).

The decision, and where the line is

hobbs-7op, P1: sign it, or send Dario the reduced scope Rowan will accept. Those are the two options and there is no third that is not the current state.

Hobbs never signs and never spends. Authority row 12 names this change order explicitly, alongside the Tessellate pro-rata and every capital call. What Hobbs can do is put it in front of him with the two options named, which is what this note is.

What is not known

  • Whether Dario has moved since the change order landed. Unknown, and open since 5 September.
  • What the 20% overrun buys, and whether the reduced scope is a real option or a sentence. Never established.

The thing behind it that is not this project

Rowan personally guaranteed part of the Rivet Yard loan. [[Bea Nkemelu]] knows; [[Maya]] does not. That is ADR-17, it lives in Atlas/decisions.md because it binds four ventures, and it is named here because an $84,000 decision on this property is not fully legible without it. The task attached to it — tell Maya — is explicitly not urgent, not this week, does not expire, and is not chased into the daily brief. hobbs-e1y.

Markdown source
---
type: project
venture: rivet-yard
status: active
outcome:
owner: Rowan
due:
updated: 2026-09-23
---

# The $84,000 change order

<!-- src: Atlas/ventures/rivet-yard/VENTURE.md, split out 2026-09-23 under ADR-31 -->

**[[Dario Pineda]] is 20% over with no signed change order.** The change order is
**$84,000** and it is unsigned on Rowan's desk.

## The age, derived and not decremented

**"Five weeks" as of 5 September**, which is Rowan's own count and the only count
anyone has stated. **Re-derived against 2026-09-23 from that figure and that
date: roughly seven and a half weeks.** The figure is derived from his statement,
not from a fresh one — nobody has asked Dario or Rowan for a current count
(SL-01: a count is transcribed from a source, never carried forward from the last
time it was written).

## The decision, and where the line is

`hobbs-7op`, P1: **sign it, or send Dario the reduced scope Rowan will accept.**
Those are the two options and there is no third that is not the current state.

**Hobbs never signs and never spends.** Authority row 12 names this change order
explicitly, alongside the Tessellate pro-rata and every capital call. **What
Hobbs can do is put it in front of him with the two options named, which is what
this note is.**

## What is not known
- **Whether Dario has moved since the change order landed.** Unknown, and open
  since 5 September.
- What the 20% overrun buys, and whether the reduced scope is a real option or a
  sentence. **Never established.**

## The thing behind it that is not this project

Rowan **personally guaranteed part of the Rivet Yard loan.** [[Bea Nkemelu]]
knows; [[Maya]] does not. That is **ADR-17**, it lives in `Atlas/decisions.md`
because it binds four ventures, and it is named here because an $84,000 decision
on this property is not fully legible without it. **The task attached to it —
tell Maya — is explicitly not urgent, not this week, does not expire, and is not
chased into the daily brief.** `hobbs-e1y`.